The 'Required' label displays twice under 'Hold not needed after' when confirming a hold
I can confirm this in 22.11: * Set both hold dates to required via OPACMandatoryHoldDates * Set OPACAllowHoldDateInFuture to Allow * Place a hold in the OPAC, leave dates empty * Verify the Required in red appears twice on each date field The problem is not present in the current development version.